Esteem wins order for Supply of two new Fired Heaters
Heaters are part of new Prime G unit of BS VI project at IOCL Gujarat Refinery
As part of the BS-VI up-gradation project, Indian Oil Corporation Ltd., Gujarat Refinery has placed an order on Esteem for the supply of two new Fired Heaters for their new Prime G unit.
Both the heaters have a Forced Draft Vertical cylindrical configuration with a top-mounted APH and stack.
Esteem's scope would include Project management, residual design & engineering, preparation of fabrication drawings, procurement, and supply of Heater System components/auxiliaries, fabrication/subassemblies in modules, fabrication, erection, construction supervision at shop/site and Inspection / Quality assurance activities.
Engineers India Ltd. (EIL) is the project management consultant (PMC) for this project.
Esteem conveys our heartfelt gratitude to EIL and IOCL for selecting us for this prestigious project.